This site explains the roof installation process in Oro Valley, step by step: what happens before the crew arrives, how each layer of a roof goes on, what quality installation looks like on tile, shingle, metal and foam, and how to prepare your home and family for the noise and disruption. The articles below cover specific projects like additions, skylights and solar tubes. This page is the overview.

Newly installed concrete tile roof with a chimney

Whether you’re replacing a worn-out roof or roofing a new addition, most of what determines how long a roof lasts happens out of sight: the deck, the underlayment, the flashing and the ventilation. Knowing the steps helps you ask the right questions and recognize good work.

Before the work starts

  1. Inspection and measurement. The contractor measures the roof, checks the attic and decking, and identifies problem areas.
  2. Written scope and contract covering materials, underlayment, flashing, ventilation, deck repair pricing, cleanup, schedule and warranty.
  3. HOA approval, if your neighborhood requires it. Many Oro Valley associations review roof material, profile and color before work begins.
  4. Permit. Re-roofs and new roofs generally need a permit from the Town of Oro Valley (or from Pima County for homes outside town limits).
  5. Material delivery and scheduling. Tile pallets are heavy, so plan where they’ll be staged on the driveway or roof.

Preparing your home

  • Move vehicles out of the garage and driveway, and clear patio furniture and potted plants away from the house.
  • Take pictures and fragile items off interior walls; hammering and vibration travel through the house.
  • Cover belongings in the attic or garage to protect them from dust.
  • Plan for noise. Tear-off is loud, so arrange for pets, young children or anyone working from home.
  • Tell your neighbors, especially if your driveway is shared or close to theirs.

See preparing your home, yard and family for a roof installation.

How a roof goes on, layer by layer

1. Tear-off

On a replacement, the old roofing is removed down to the deck, and debris goes straight into a dumpster or trailer. Good crews protect landscaping, windows and pools with tarps.

2. Deck inspection and repair

With the deck exposed, damaged or rotted sheathing is replaced and loose boards are re-nailed. This is the only time the deck can be properly checked.

3. Underlayment

Underlayment is the waterproof layer over the deck. On tile roofs it’s the primary barrier against water, so the product choice matters. Ask which underlayment is being used and whether it meets the tile manufacturer’s and the Tile Roofing Industry Alliance’s guidance for the climate.

4. Flashing

Metal flashing is installed at valleys, walls, chimneys, skylights and penetrations, along with drip edge at eaves and rakes. Reusing old, corroded flashing to save money is a common shortcut. New flashing should be the norm.

5. Ventilation

Intake and exhaust vents are installed or corrected. On tile roofs, low-profile tile vents keep the look clean. Balanced ventilation keeps attic heat down and helps the roof last longer. See the roof ventilation guide.

6. The roof covering

  • Tile is set on battens or directly on the underlayment and fastened with nails, screws or approved adhesive, following the manufacturer’s requirements for wind resistance. Ridge, hip and eave details, plus bird stops, finish the job.
  • Shingles are nailed in a specific pattern, with starter strips and ridge caps.
  • Metal panels are fastened with clips or screws, with special attention to seams and trim.
  • Foam is sprayed to a specified thickness and then coated. See the foam roofing guide.

7. Cleanup and final inspection

A magnetic sweep picks up nails from the yard and driveway, and the permit is closed out with a final inspection.

Signs of quality installation

  • The crew follows the manufacturer’s installation instructions, which is also what keeps the material warranty valid.
  • New flashing at walls, valleys and penetrations, not old flashing caulked back into place.
  • Straight, consistent tile and shingle lines, with no cracked tiles left in place.
  • Roofing cement used sparingly, not as a substitute for proper flashing.
  • A clean site at the end of each day, and the roof dried in before any afternoon storm.

Special projects

Additions and Arizona rooms

Tying a new roof into an existing one is where many leaks begin. The connection needs proper flashing, matching slope where possible, and drainage that doesn’t dump water onto the old roof. See a step-by-step guide to roofing a home addition.

Skylights and solar tubes

Cutting into a tile roof means removing and trimming tile, framing the opening, and flashing the unit so water flows around it. See skylight or solar tube? what goes into cutting one into a tile roof.

Solar-ready roofs

If solar is in your future, a new roof is the best time to plan for it. See the solar-ready roofing guide.

After installation

Get the warranty paperwork in writing: the manufacturer’s material warranty and the contractor’s labor warranty, plus any registration the manufacturer requires. Keep the permit record and final inspection with your home documents. See what roof warranties mean for Oro Valley homes, and check any contractor’s license with the Arizona Registrar of Contractors before you sign. The newest articles on this site are listed below.